Case Study 02: Consolidation halts chalk influx, and the well keeps gaining.

Well #5 · 5-zone VitriReinforce treatment via coil tubing. Solids-free production for 25+ months · status as of June 2026.

Five-zone treatment via coil tubing

Long horizontal well · 5 treatment zones · Zones 1–4 sliding sleeves · Zone 5 ~2000 m limited-entry liner.

A shut-in well, brought back stronger

A horizontal well was shut in with severe chalk influx. The program set out to increase drawdown capability and bottom-hole-pressure tolerance below the previous failure level, verify that consolidation prevents solids production, and validate injection via stimulation vessel and coil tubing.

25+ months, solids-free

Stable production for 25+ months with zero solids influx — ongoing as of June 2026. PI trend has improved since treatment. Drawdown now 40+ bar above the previous failure level. Flowing BHP now 30+ bar below the previous failure level. The well continues to produce while reducing BHP and increasing drawdown.