Case Study 01: Five years non-flowing. Restored, then stress-tested to prove it.

Norwegian Continental Shelf · 2 proppant-fractured zones · VitriReinforce bullheaded. Qualitative assessment of chalk consolidation · 7-week validation programme completed.

Two proppant-fractured zones, bullheaded

Vertical well · 2 proppant-fractured zones · coiled tubing with straddle (isolation not achieved) · treatment bullheaded into both zones.

A well written off for five years

A proppant-fractured vertical well with chalk-influx history and water ingress from a nearby injector — not produced for 5 years due to chalk instability. The trial set out to restore flow, verify consolidation by deliberately stressing the formation with repeated hard openings and hard closings, and place the treatment by coiled tubing with straddle.

Restored, and stress-tested hard

Produced steadily with 90% water cut for 4 weeks — previously non-flowing. Multiple hard/fast openings and hard closings tested up to 42 bar drawdown — the limit of pressure. Large pressure differentials applied across the formation to test consolidated strength. 7-week validation programme completed.